
PCB-4000 1+1 Phase Combiner Revision 2
Installation, Startup, and Troubleshooting Procedures MN/PCB4000.IOM
3–10
Step Task
7
Make sure the lock nut on the phase shifter is tightly secured by using the supplied socket, then replace the
cover panel.
3.7 System Online and Transmitting
Thisprocedure assumesthatthe systeminstallation iscomplete andthataccess tothesystem
outputportisunavailableduetocurrentsystemtraffic.
To check for proper operation, measure and compare the difference in power transmi tted
versusthepowerdissipated intheloadtermination.
Followthesesteps:
Step Task
1
A. Attach a power meter to the Combined System Output Power Test Coupler (Figure 3-1).
B. Measure the output power and include the coupler correction factor.
2
A. Attach a power meter to the Wasted (“Load”) Power Test Coupler (Figure3-1).
B. Measure the power and include the coupler correction factor.
3
The Wasted (“Load”) power level should be 15-20 dB below the power being transmitted to the
antenna.
Komentarze do niniejszej Instrukcji