
2–1
Chapter 2. INSTALLATION
2.1 Unpacking and Inspecting the CPA ISSPA
The CPA ISSPA and its Installation and Operation Manual were packaged and shipped in a reusable
cardboard carton containing protective foam spacing. Once opened, inspect the shipment:
Step Task
1
Keep all shipping materials for storage or reshipment.
2
Check the packing list to ensure the shipment is complete.
3
Inspect the equipment for any possible damage incurred during shipment. Contact the carrier
and Comtech EF Data immediately to submit a damage report if damage is evident.
4
Review the Installation and Operation Manual carefully to become
familiar with operation.
5
Proceed to Section 2.2 Installing the CPA ISSPA I
Enclosure.
Komentarze do niniejszej Instrukcji